Sign In | Join Free | My adobecards.com
China TORICH INTERNATIONAL LIMITED logo
TORICH INTERNATIONAL LIMITED
TORICH INTERNATIONAL LIMITED Make Your Steel Tube Purchase Easy!
Verified Supplier

8 Years

Home > Seamless Precision Steel Tube >

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

TORICH INTERNATIONAL LIMITED
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

Place of Origin : Zhejiang, China (Mainland)

Certification : ISO 9001 TS16949 ISO 14001

Price : negotiable

Standard : ASTM, DIN

Grade : 10#, 20#, Q235, Q345, Q195, Q215, St37, St52, St45, St37-2, St52.4, ST37.4

Product name : erw welded pipe / erw round tube

Application : Hydraulic Pipe, Auto Parts

Technique : Cold Drawn

Special Pipe : Drawn Over Mandrel

Production Method : Drawn Over A Mandrel (DOM)

Keyword : Welded Stainless Steel Tube

Material : Carbon Steel

MTC : EN10204 3.1B

MOQ : negotiable

Contact Now

EN10305-2 Cold Drawn Welded Precision Steel Tubes DOM tubing

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

EN10305-2 Cold Drawn Welded Precision Steel Tubes DOM tubing

DOM is a process that is applied to tubing after it is initially constructed.It is refferred to as Seamless ,It can be said that do seamless process method on ERW tubes,So the tubes will have a high strength ,high quality .Material form E155 E195 E235 E275 E355 1020 1026 and so on .DOM tubing is commonly use in auto parts .

welded stainless steel tube fittings

Production Process:
Cold rolling by Cold pilger machine and Cold rolling machine
Size: 6-350mm

WT: 1.0-35mm


1. Standard:
EN10305-2 Cold Drawn Precision Seamless Steel Pipes


2. Steel Grade:
E155,E195,E235,E275,E355, other materials upon agreement with customers.


3. Production method:
Cold drawn on the welded steel tubes, to reach high accuracy on the OD and WT tolerance

4. Packing:
In Hexagonal Bundles, with anti-rust oil protection, with seaworthy packing


5. Deliver condition:
1). +C No heat treatment after the final cold drawing process
2). +LC After the final heat treatment there is a suitable drawing pass
3). +SR After the final cold drawing process there is a stress relieve heat treatment in a controlled atmosphere
4). +A After the final cold drawing process the tubes are annealed in a controlled atmosphere
5). +N After the final cold drawing operation the tubes are normalized in a controlled atmosphere

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

Detailed Images

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

EN10305-2 Cold Drawn Welded Precision Steel Tubes DOM tubing
























Product Tags:

precision seamless pipe

      

black carbon steel pipe

      
 EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing Manufactures

EN10305 - 2 Cold Rolled Seamless Tube , Auto Parts ERW Dom Steel Tubing Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: TORICH INTERNATIONAL LIMITED
*Subject:
*Message:
Characters Remaining: (0/3000)